Roadmap
The Australian Electricity Market Operator makes available a wealth of market data and forecasts. This unique transparency and further the availability of public GIS data sources should allow to derive a relatively accurate model of the Eastern Australian power grid, making it a perfect test bed with real data.
The following points are the planned next steps in the development of this package:
Short-term
[ ] Inclusion of all unit types in the system.
[ ] Review assumptions made for the operational costs.
[ ] Create a full network configuration with all lines (using GIS data) for AC/DC operation problems (work started in nemdb).
[ ] Account for Commissioning / Decommissioning dates to model the system at different years.
[ ] Parse latest ISP assumptions for operation costs.
[ ] Extend PowerSimulations with constraints specific to the NEM (e.g. FCAS constraints, interconnector constraints).
[ ] Separate the AustralianElectricityMarketData module in its own package.
Mid/Long-term
[ ] Extend the parsing of ISP inputs.
[ ] Interface with GenX for resource capacity expansion modelling.
[ ] Develop a general interface in a package
ElectricityMarkets.jl.[ ] Full documentation of the interface.
[ ] PoC of the interface with another region's electricity market.